CIFEKOH
CLASSIC CASE

CLASSIC CASE

VIEW MORE
scroll down

CLASSIC CASE

The cross-river tunnel is approximately 15.3km long, including 8.3km from Chongming Island to Changxing Island (North Changjiang Port) and 7.0km from Changxing Island to Pudong (South Changjiang Port) (tunnel outer diameter 4000mm). The construction method used is shield construction.

Fan Model: SDF(p4)-N o 8.0/4x55

Total Installed Power: 220kW

Matching Air Duct: ф900mm

Relay Fan

Fan Model: SDF(p2)-N o 6.5/4x22

Total Installed Power: 88kW